Project HS
Scope: 15 RTU controls swap out and 11 FPB/VAV's
Programming Scope: This project utilized the canned Honeywell program. My scope was installing the controllers, graphics and close out. Another tech performed P2P and ensuring units were configured.
Summary: The engineering for this project should have been field engineered. There were multiple items that could have been streamlined which would have prevented some rework and decreased scope. I was tasked with installing the controllers at the units, then took over after P2P to finish graphics and ensure a smooth close out.